Analysis of Datums and Elevations in USACE Projects: FINAL REPORT

Analysis of Datums and Elevations in USACE Projects: FINAL REPORT The USACE assembled this team as a direct result of the catastrophic losses endured after Hurricane Katrina struck the Gulf Coast in 2005. The emphasis on vertical accuracy came about…

The Pontchartrain Levee District Progress Report – 2012

The Pontchartrain Levee District Progress Report – 2012 From the Report: The Pontchartrain Levee District (PLD) is the local sponsor for the projects referenced herein. Currently, there are projects in each of the six parishes comprising the PLD’s jurisdiction. As…

The Control of Nature – Morganza Spillway

John McPhee has written a fascinating history of the River Control Structure at Morganza. While it is not clear that the Mississippi still wants to go down the Atchafalaya, losing the River Control Structure in a flood would still be a…

What is the Corp Really Building in New Orleans?

From the University of Colorado Natural Hazards Observer:

Corps of Engineers’ Steven Stockton
Avoiding the Single Line of Defense
Natural Hazards Observer • September 2010

“Where are the visionaries for the future? [Congress’] focus is on a million different areas. It’s not on water infrastructure or on disaster risk mitigation,” says Steven Stockton, director of Civil Works for the U.S. Army Corps of Engineers.[…]

Community Resilience – Lessons from Katrina